(WtoE) Power Plant

Renergenc Limited, an independent Green Power Producer (IGPP) exploits waste to wealth prospects in Ghana fro mutual benefits. Renergenc approached ERC for an Environmental & Social Impact Assessment (EISA) and Monitoring Report proposed Waste to Energy (WtoE) Power Plant Project in Ablekuma-Joma, suburb of Accra.

Bulk Supply Point

The US $488.2 million Ghana Power Compact, funded by the United States Government through its agency, the Millennium Challenge Corporation (MCC), is supporting the construction of Bulk Supply Point (BSP) in Pokuasi to improve the quality of power supplied tp the northern part of Accra. The pokuasi BSP will be the first 330kv Bulk Supply in Accra and the Largest in Ghana when completed. 

The project will be developed under the existing 330kv Aboadzi-Volta-Lome Transmission line at Pokuasi. The BSP shall have a total capacity of 580MVA compromising four (4) 330/34.5kv 145MVA Power Transformer. The contractor for the project is Elecnor S.A. Of Spain with SMEC international PTY Ltd as the Project Engineers.

ERC produced HSES documentation in line with IFC Environmental and Social Performance Standards (IFC PS) and Ghanaian legislation to facilitate project commencement.

Offshore Pipeline Survey

The US $488.2 million Ghana Power Compact, funded by the United States Government through its agency, the Millennium Challenge Corporation (MCC), is supporting the construction of Bulk Supply Point (BSP) in Pokuasi to improve the quality of power supplied tp the northern part of Accra. The pokuasi BSP will be the first 330kv Bulk Supply in Accra and the Largest in Ghana when completed. 

The project will be developed under the existing 330kv Aboadzi-Volta-Lome Transmission line at Pokuasi. The BSP shall have a total capacity of 580MVA compromising four (4) 330/34.5kv 145MVA Power Transformer. The contractor for the project is Elecnor S.A. Of Spain with SMEC international PTY Ltd as the Project Engineers.

ERC produced HSES documentation in line with IFC Environmental and Social Performance Standards (IFC PS) and Ghanaian legislation to facilitate project commencement.

Gold Recovery Ghana Ltd

Gold Recovery Ghana operates a gold mining facility processing tailings for gold ore extraction at Tema Industrial Area in Ghana. The company engaged ERC to carry out perimeter noise monitoring, effluent testing, stack emissions and ambient air quality monitoring for environmental regulatory compliance for the Ghana Environmental Protection Agency (EPA) and international Finance Corporation (IFC) requirements.